• Dessalines
    link
    fedilink
    821 hours ago

    5m seems about right. Lemmy’s from scratch builds are ~3.5m on a fast machine, and we have ~60k lines of code, and are using some with large libraries with lots of features enabled.

    But you really should only ever have to do a from scratch build either at the beginning, or when you deploy. When developing, your IDE should only ever really run check or clippy, which should take seconds at most.

    • ☆ Yσɠƚԋσʂ ☆
      link
      fedilink
      421 hours ago

      I should really revisit this. I know I looked at it again. The compiling crops up I you actually want to run the app and test drive the changes live.